The door lock and handles were installed plus some finishing trim was added to the door.
















Electricity enters the shed at an opening on the left and connected to a 20 Amp GFCI receptacle. The other blue cable just above is the Cat 5e network cable.
















More electrical work was performed to prepare for the next electrical inspection. Holes were drilled into the studs to run 12 gauge/3 wire NM electrical cable. The one wall switch in the junction box controls power to a ceiling junction box. The junction box hanging on the cable will be for an exterior light. Junction boxes were also mounted for receptacles throughout the shed.

















The junction box between the ceiling joists is for a ceiling fan. The light is temporary.